Magnefast Bulk Port Authority
This port facility is one of the largest in the world and handles shipments of iron ore, lithium concentrate and salt. In October 2019 a trial installation of the Elastotec Magnefa
Lagging Selection – One of the 4 Pillars of Lagging Performance
Lagging can be of good quality and application can be correct, but lagging can still fail and does. Everything seems right but the lagging still doesn’t perform to expectations.
Colliery Transfer Chute Diverter
Elastotec Magnefast Ceramic Wear Panels were chosen for the application in this colliery transfer chute as the use of studded wear panels would have been very difficult and time co