Elastotec adhesion testing

Elastotec adhesion testing Blog List Image

At Elastotec, we engineer lagging solutions that keep conveyors running. Here are some causes of lagging failure.

Hot Vulcanised Lagging Application

Hot Vulcanised Lagging Application

Hot Vulcanised lagging application involves the chemical cross-linking of five reactive layers during the autoclave curing process. To achieve the desired 100% rubber tear adhesion all five layers must crosslink at the same time. Occasionally conditions can be created in the autoclave that prevent this happening, and result in non-uniform adhesion around the pulley circumference. This bulletin explains how these conditions occur and what needs to be done to eliminate this problem.

New Approved Applicator

New Approved Applicator Blog List Image

Elastotec Approves New Applicator in Thailand for Hot Vulcanised Ceramic Lagging (HVCL) Early in 2019 Kledkaew Inter Products Co, Ltd. a rubber lining company based in Bangkok Thailand were approached by a representative from a major power station, with a request for a pulley lagging that would significantly extend the lagging service life beyond the […]

Curragh coal mine – improved service life of conveyor pulleys

Curragh coal mine – improved service life of conveyor pulleys

The Curragh Coal Mine is an open cut coal mine located near Blackwater in Central Queensland, Australia. The mine supplies high quality, low ash coking coal and has reserves of approximately 90 million tonnes which is amongst the largest in the world. Coal from Curragh is shipped via the Blackwater rail system to the Port of Gladstone for export. Curragh Coal mine is owned by the Coronado Coal Group a US based company.

BlueScope Steel Port Kembla

BlueScope Steel Port Kembla Image 1

BlueScope steel was formerly a business within BHP Billiton that became and independent company in 2002. With well known brands such as COLORBOND®, ZINCALUME® and GALVABOND® BlueScope provides engineered building solutions to meet a multitude of end uses.

PT Freeport

PT Sandvik Lagging Technicians

Grasberg Mine PT Freeport Indonesia – PROK/Elastotec Hot Vulcanised Ceramic Lagging Case Study. The Grasberg open pit mine is the largest gold mine and the third largest copper mine in the world.

PT Kembla Coal Terminal

PT Kembla Coal Terminal

In early 2012 Port Kembla Coal Terminal (PKCT) identified a need to refurbish the drive pulleys on their two Stacker Reclaimer units. Included in this refurbishment was replacement of the lagging.

New Technology Improves Service Life of Ceramic Pulley Lagging

New Technology Improves Service Life of Ceramic Pulley Lagging Featured Image

Elastotec has developed an innovative ceramic pulley lagging system with superior bond strength and outstanding durability, eradicating traditional issues associated with ceramic lagging and making it a unique offering in the market. Ceramic pulley lagging is ideal for pulley applications that require increased wear resistance, as well as increased levels of drive. Capable of delivering an extended service life of […]

Request FREE Demo Enquiry

This field is for validation purposes and should be left unchanged.
Name(Required)
Country(Required)

Job Opportunities Enquiry

This field is for validation purposes and should be left unchanged.
Name(Required)
Country(Required)

Request a Quote

This field is for validation purposes and should be left unchanged.
Name(Required)
Country(Required)

Contact Pulley Lagging Popup

This field is for validation purposes and should be left unchanged.
Name(Required)
Country(Required)

Contact Wear Panel Team

This field is for validation purposes and should be left unchanged.
Name(Required)
Country(Required)

Thanks For Requesting
Our Documents

Please provide us quick details before downloading the document.

This field is for validation purposes and should be left unchanged.
Name(Required)