Consequences of Catastrophic Failure with Cold Bonded Lagging for New Mining Projects

Catastrophic lagging failure due to debonding occurred within two weeks of installation and operation of the pulley, resulting in a shutdown of production, and necessitated a replacement of the pulley. Within only two weeks of service, this ceramic lagging was already experiencing loss of the ceramic tiles.
Oyu Tolgoi High Tension Bend Pulleys – Improved Performance

Oyu Tolgoi is a large copper mine that has both open-cut and underground operations and has been operating since 2013. The mine is jointly owned by the Mongolian government and Rio Tinto and is located in the South Gobi Desert. Once fully operational, the mine is expected to produce 450,000 tonnes of copper annually.