Wear Panel Case Studies

Polymetallic metal mine

Magnefast – Polymetallic metal mine

Magnefast trial achieved 6 MONTHS service life meeting the current liner objective. The Magnefast liners showed 7 mm of wear in a 50 mm thick ceramic so panels have not been replaced and are expected to eliminate a number of liner…

 PDF this page
Read More >>

Reduce maintenance time

80% less replacement time with Magnefast. Increase conveyor operating time. Do more during shutdown. Save on labour time. No crane needed.

 PDF this page
Read More >>

Large Gold Mine

As part of a major production upgrade at a large gold mine Carters Engineering was asked to produce a new slurry box for the ore treatment plant. The slurry box was to be located in a position with difficult access making removal/replacement difficult.

 PDF this page
Read More >>

Quarry – Screen Underpan Chute

This quarry located in the south-eastern region of New South Wales is a hard rock quarry that can produce up to 1.5 million tonnes per annum of quarry products.

 PDF this page
Read More >>
Magnefast is safe

Magnefast is safe

Keep your staff safe with no external scaffolding, no electrical, hydraulic or pneumatic tools – no drop from heights risks or stud cutting.

 PDF this page
Read More >>
Magnefast is easy to use

Magnefast is easy to use

No scaffold/studs or tools needed to install, great for locations with difficult access, no hole-stud alignment needed, no panel gaps.

 PDF this page
Read More >>
Introduction to Magnefast

Introduction to Magnefast

Magnefast is a patented single sided attachment system for wear panels that uses high strength neodymium magnets to hold the panels in place.

 PDF this page
Read More >>
Magnefast Bulk Export

Magnefast Bulk Port Authority

This port facility is one of the largest in the world and handles shipments of iron ore, lithium concentrate and salt. In October 2019 a trial installation of the Elastotec Magnefast ceramic wear panels was put in place – this trial installation is still in service today. In December 2020 a chute with studded steel wear liners was relined with Magnefast ceramic wear liners.

 PDF this page
Read More >>