Elastotec Lagging – Hot Vulcanised Ceramic Lagging

A large bauxite mine in Australia, running an overland conveyor with an ST3600 belt, 1050mm wide, has successfully introduced Elastotec Hot Vulcanised Ceramic Pulley Lagging to one of its sites.
Large Gold Mine in Australia – increased service life of pulleys with Elastotec/PROK HVCL

One of the largest gold mines in Australia, located in southeast of Perth, produces around 750,000 ounces of gold annually and 80 million pounds of copper and has a workforce of 2,000 people. This mine has an expected life of 20 years.
Hot Vulcanised Ceramic Lagging – the road to increased conveyor availability

A large bauxite mine in Australia, running an overland conveyor with an ST3600 belt, 1050mm wide, has successfully introduced Elastotec Hot Vulcanised Ceramic Pulley Lagging to one of its sites.