Reduce maintenance time

80% less replacement time with Magnefast. Increase conveyor operating time. Do more during shutdown. Save on labour time. No crane needed.
Large Quarry – Train Loadout Deflector

Located in southwest of Sydney this hard rock quarry can produce up to 5 million tonnes per annum of products (ballast, aggregate, manufactured sand and road base).
Magnefast is safe

Keep your staff safe with no external scaffolding, no electrical, hydraulic or pneumatic tools – no drop from heights risks or stud cutting.
Magnefast proven performance

Magnefast wear panel solutions: proven performance for large Copper & Coal Mines, Power Station, Sand & Gravel Quarry, Iron Ore Export Port.
Magnefast is easy to use

No scaffold/studs or tools needed to install, great for locations with difficult access, no hole-stud alignment needed, no panel gaps.
Introduction to Magnefast

Magnefast is a patented single sided attachment system for wear panels that uses high strength neodymium magnets to hold the panels in place.
Magnefast Bulk Port Authority

This port facility is one of the largest in the world and handles shipments of iron ore, lithium concentrate and salt. In October 2019 a trial installation of the Elastotec Magnefast ceramic wear panels was put in place – this trial installation is still in service today. In December 2020 a chute with studded steel wear liners was relined with Magnefast ceramic wear liners.
Colliery Transfer Chute Diverter

Elastotec Magnefast Ceramic Wear Panels were chosen for the application in this colliery transfer chute as the use of studded wear panels would have been very difficult and time consuming to install.
Magnefast Diverter Flap install

Magnefast Diverter Flap Installation in a coal prep plant trouser chute