
Reduce maintenance time
80% less replacement time with Magnefast. Increase conveyor operating time. Do more during shutdown. Save on labour time. No crane needed.
80% less replacement time with Magnefast. Increase conveyor operating time. Do more during shutdown. Save on labour time. No crane needed.
Located in southwest of Sydney this hard rock quarry can produce up to 5 million tonnes per annum of products (ballast, aggregate, manufactured sand and road base).
Keep your staff safe with no external scaffolding, no electrical, hydraulic or pneumatic tools – no drop from heights risks or stud cutting.
Magnefast wear panel solutions: proven performance for large Copper & Coal Mines, Power Station, Sand & Gravel Quarry, Iron Ore Export Port.
No scaffold/studs or tools needed to install, great for locations with difficult access, no hole-stud alignment needed, no panel gaps.
Magnefast is a patented single sided attachment system for wear panels that uses high strength neodymium magnets to hold the panels in place.
This port facility is one of the largest in the world and handles shipments of iron ore, lithium concentrate and salt. In October 2019 a trial installation of the Elastotec Magnefast ceramic wear panels was put in place – this trial installation is still in service today. In December 2020 a chute with studded steel wear liners was relined with Magnefast ceramic wear liners.
Elastotec Magnefast Ceramic Wear Panels were chosen for the application in this colliery transfer chute as the use of studded wear panels would have been very difficult and time consuming to install.
Magnefast Diverter Flap Installation in a coal prep plant trouser chute