Case Study Title
Case Study Overview
Australia’s biggest gold producer was experiencing significant conveyor downtime due to frequent pulley lagging failures. A successful trial of Elastotec’s Hot Vulcanised Ceramic Lagging in 2014 lead to the adoption of Elastotec HVCL across 50+ pulleys by 2017. A study in 2023 reported zero reported lagging failures, with the HVCL remaining in excellent condition – eliminating the need for reinstallation and costly downtime (the lagging actually outlasted the mechanical components of the pulleys themselves). This case study highlights how Elastotec’s HVCL significantly improves durability, reduces maintenance costs, and enhances operational efficiency.
Explore Other Case Studies
Magnefast Deflector Reline
A major quarry in Western Australia sought to improve the efficiency and durability of its train load out deflector system.
Modal Box Title
Modal Box Content
Modal Box Title
Modal Box Content
HOLCIM Train Load Out Chute Reline
A high-wear transfer chute was previously shut down every few weeks for liner replacement, requiring hot work and long maintenance hours.
Modal Box Title
Modal Box Content
Modal Box Title
Modal Box Content
Magnefast Multi-mineral Ore Body Mine
A multi-mineral ore body mine in northern South Australia producing copper, gold, silver, and uranium began a Magnefast high performance trial in…
Modal Box Title
Modal Box Content
Port Hedland Increased Wear Life
At Port Hedland, the world’s largest bulk export port, trialled Elastotec’s Magnefast Ceramic Wear Panels seeking to address the need for faster…
Modal Box Title
Modal Box Content