From Trial to Transformation at the World’s Largest Bulk Export Port
In 2019, a major export port in Port Hedland trialled the Magnefast™ Ceramic Wear Panels to solve a costly problem: Regular 10 monthly shutdowns to replace the studded Bisalloy wear liners, crane hire, and a 38 hour shut window to complete a wear liner change.
Operating 24/7 and handling iron ore, lithium and salt, they needed a solution that delivered longer service life and shorter shutdowns. In 2019, the first trial installation of Magnefast™ Ceramic Wear Panels was put in place.
Fast forward to today:
✅ The trial chute is still in operation, five years on
✅ Six chutes have now been fully converted to Magnefast™
✅ Shutdown durations reduced by 80%
✅ Liner service life increased by ~500%
The modular Magnefast™ system not only cuts downtime – it transforms planning, safety, and long-term maintenance efficiency.