News

Latest News & Insights

Stay up to date with our latest innovations, project successes, and industry insights.
Discover how we’re helping mining and quarry operations achieve safer, faster, and more efficient maintenance with cutting-edge solutions.

Material Selection: A Key Criteria for Performance Service Life

Wear Panel Solutions Engineered to Perform At Elastotec, we specialise in high-performance wear panel systems for the most demanding environments...

Polymetallic metal mine

Magnefast™ – Polymetallic metal mine

Magnefast trial achieved 6 MONTHS service life meeting the current liner objective. The Magnefast liners showed 7 mm of wear...

Operations/Engineering Manager – Wear Panels

Elastotec is seeking an operational leader to support its wear panel sales team in delivering all aspects of the ultimate...

Improvements in Wear Liner technology

We are thrilled to share an exciting development in the field of bulk materials handling! Our recent paper, presented at...
Wear liner Tech

Magnetic Wear Liner Attachment Innovation

Abstract: In bulk materials handling, areas prone to high wear are lined with wear-resistant materials that operate sacrificially and require...

Magnepatch

The Magnepatch panel can be applied over the hole on the outside of the chute with the high strength magnets...
Drop Chute and conveyor#2

When a newly installed SCAT Drop Chute at one operation began experiencing severe material build-up, it quickly created a costly maintenance challenge.

ICBMH We're Presenting news

Advancing Pulley Lagging and Wear Protection Technology Elastotec is proud to be presenting at the International Conference on Bulk Materials Handling (ICBMH)

CS-Magnefast eliminated 14-week liner replacement

For many bulk handling operations, transfer chute maintenance is an unavoidable part of every shutdown. Wear liners require constant attention, temporary repairs

Magnefast Top Chute copy (1)

Taking Wear Liners From a 13 Week Replacement Cycle to >104+ Weeks — What Changed? Most chute maintenance problems don’t begin with

New Mine Start Up

As new mining operations move from construction into production, the decisions made during the design and commissioning phase can have a long-term

1770939405752

In underground mining, ventilation systems are critical to safe and efficient operations but they are also highly exposed to abrasive wear. In

Filter by Date:

Reset

Request FREE Demo Enquiry

This field is for validation purposes and should be left unchanged.
Name(Required)
Country(Required)

Job Opportunities Enquiry

This field is for validation purposes and should be left unchanged.
Name(Required)
Country(Required)

Request a Quote

This field is for validation purposes and should be left unchanged.
Name(Required)
Country(Required)

Contact Pulley Lagging Popup

This field is for validation purposes and should be left unchanged.
Name(Required)
Country(Required)

Contact Wear Panel Team

This field is for validation purposes and should be left unchanged.
Name(Required)
Country(Required)

Thanks For Requesting
Our Documents

Please provide us quick details before downloading the document.

This field is for validation purposes and should be left unchanged.
Name(Required)